Sheetpiling & Dewatering

Texco completed three sheet pile pits to allow the installation of three sewerage pump stations.

This was part of the Picton sewerage upgrade. Texco completed the temporary works design, installation and excavation of the sheet pile boxes along with maintaining dewatering throughout the duration of the project.

The pits ranged in depths from 6 - 7.5m below ground level.

Client

Fulton Hogan Marlborough

Time Frame

June 2017 - Feb 2018

Contact Scale

Over $500,000