CDHB Outpatients Building

Concrete filled bored piles

Texco Drilling and Piling Ltd were contracted to install 43 concrete bored piles of both 1200mm & 900mm diameter.

Piles were drilled 24m below ground level using polymer drilling fluids to hold back the high aquifer pressures.

Client

Leighs Cockram Joint Venture

Time Frame

3 months, over last quarter of 2016 (averaging 3 piles a week)

Contact Scale

Over $1,000,000

"Whilst we are guided by our Safety and Quality Management Systems, we still believe in the integrity of a handshake."